Apartment Unit Turn Cost Guide 2026 | GNX

Multifamily & Commercial

Apartment Unit Turn Cost Guide for Property Managers (2026)

A standard apartment make-ready runs $3,000 to $5,000 per unit in 2026, with light turns from $1,500 and heavy turns exceeding $12,000. Here is the full cost breakdown by line item and what actually moves the number.

8 min readGNX Development
Apartment unit turn cost guide - GNX Construction make ready flooring paint Orlando

A standard apartment make-ready costs between $3,000 and $5,000 per unit in 2026, with the U.S. multifamily average landing near $3,900 per move-out when you include labor, materials and the lost rent of vacancy. Light turns start around $1,500 and heavy turns with full flooring replacement can exceed $12,000. For a property manager, understanding where that money goes is the first step to controlling it. Here is the full breakdown.

Unit Turn Cost by Turn Type (2026)

Turn TypeTypical Cost per UnitWhat It Includes
Light turn$1,500 - $3,000Touch-up paint, cleaning, minor repairs, rekey
Standard make-ready$3,000 - $5,000Repaint, flooring repair/partial, drywall patch, punch list
Heavy turn$8,000 - $12,000+Full flooring replacement, full repaint, appliance and larger repairs

Cost by Line Item

Line ItemCost RangeNotes
Paint (touch-up)$250 - $600Spot and wall touch-up between residents
Paint (full repaint)$1,200 - $3,500Walls, trim and ceilings, unit-wide
Flooring (patch/clean)$150 - $500Spot repair or clean of existing floor
Flooring (full LVP replacement)$1,500 - $8,000+Biggest swing in the budget, size dependent
Drywall & repairs$150 - $1,500Patching, texture, doors, trim, minor carpentry
Cleaning & punch list$150 - $500Deep clean and closeout of leasing walkthrough items

What Drives the Number Up

  • Flooring scope: Full replacement versus spot repair is the single biggest cost swing in any turn.
  • Length of tenancy: Longer stays usually mean heavier wear and a heavier turn.
  • Damage beyond normal wear: Water damage, pet damage or neglected maintenance push a light turn into a heavy one.
  • Vacancy days: Every day a turned unit sits unrented is lost revenue, so slow turns cost more than the invoice shows.
  • Vendor coordination: Juggling separate flooring, paint and drywall vendors adds schedule gaps and days.

How to Control Unit Turn Cost

  1. Standardize materials: One LVP and paint spec across the property makes turns predictable and re-orders cheap.
  2. Use one vendor for multiple trades: Sequencing flooring, paint and drywall internally removes the gaps that add vacant days.
  3. Inspect and estimate fast: The faster the scope is approved, the faster the turn starts and the sooner the unit leases.
  4. Track cost per turn: Consistent documentation lets you spot units and vendors that run over.
  5. Preventive maintenance: Catching wear during tenancy keeps more turns in the light category.
GNX Construction turns apartment and multifamily units across Orlando and Central Florida with standardized materials, fast inspections and estimates, and multiple trades under one vendor to keep vacant days and turn cost down. Licensed and insured, COI and W-9 on file. Send us your scope for a fast, itemized estimate.
#apartment unit turn cost#make ready cost per unit#multifamily turn cost 2026#unit turn budget#property management cost
Back to all articles

Keep reading

More articles you might like

Ask any question or start a free flooring estimate.

Free estimate

Tell us about your floors. We'll come measure for free.

Fill in the form and we'll call to schedule a no-obligation in-home visit anywhere in Florida or Georgia. You get a written, itemized estimate, no pressure.

Prefer to call? (863) 265-5239
Office601 N Magnolia Ave, Orlando, FL 32801
LicenseFlorida Certified Building Contractor #CBC1269497