Florida sees thousands of new home construction starts every year, ranging from $200,000 entry-level builds to $3 million+ luxury estates. The process is complex, but having a certified building contractor manage it makes the difference between a smooth build and a nightmare. Here is what every future homeowner should know.
What Does a General Contractor Actually Do?
A general contractor (GC) manages the entire construction process: hiring and scheduling subcontractors (framing, plumbing, electrical, HVAC, roofing, etc.), obtaining all permits, coordinating inspections, managing the build timeline, and serving as the single point of accountability. In Florida, a GC license is required by law (FL Statute 489) for projects over $1,000.
The New Construction Timeline in Florida
| Phase | Duration | What Happens |
|---|---|---|
| Design and planning | 4-12 weeks | Architectural plans, site selection, budget development |
| Permitting | 4-10 weeks | Building permit, site plan approval, HOA if applicable |
| Site work and foundation | 2-4 weeks | Clearing, grading, slab or foundation pour |
| Framing | 3-6 weeks | Wood frame or concrete block structure erected |
| Rough-in trades | 4-8 weeks | Electrical, plumbing, HVAC rough-in and inspections |
| Insulation and drywall | 2-4 weeks | Wall and ceiling installation |
| Interior finishes | 6-12 weeks | Flooring, cabinetry, tile, paint, trim, fixtures |
| Exterior finishes | 4-8 weeks | Stucco, windows, exterior doors, driveway, landscaping |
| Final inspections | 1-2 weeks | Certificate of Occupancy (CO) issued |
Construction Methods in Florida
Florida new construction primarily uses two structural methods. Concrete block construction (CBS, or concrete block and stucco) is the most common in Florida due to its hurricane resistance and pest resistance. Wood frame construction is also used and is faster to build, but typically requires additional hurricane strapping and reinforcement to meet Florida Building Code requirements.
Florida Building Code Requirements
- Wind resistance: Homes must be designed to withstand specific wind speeds (110-170+ mph depending on location)
- Flood zones: Homes in FEMA flood zones must be elevated above base flood elevation
- Energy efficiency: Florida Energy Code (FEMC) requires specific insulation R-values, window ratings, and HVAC efficiency
- Hurricane windows and doors: Impact-resistant glass or hurricane shutters required in coastal zones
- Roof: Specific nailing patterns and deck attachment requirements to withstand Category 3+ hurricanes
How Much Does New Construction Cost in Florida?
In 2026, new home construction in Central Florida costs $200-$350 per square foot for standard builds, and $350-$600+ for luxury finishes. A 2,500 sq ft home costs $500,000-$875,000 in construction costs, not including the land. GNX provides fixed-price contracts to eliminate budget uncertainty.
Questions to Ask Your GC Before Signing
- Is your license current and verifiable on myfloridalicense.com?
- Do you self-perform any trades, or is everything subcontracted?
- Can you provide references for homes completed in the last 24 months?
- What is your payment schedule tied to?
- What does your warranty cover and for how long?
- Who is my primary contact throughout the build?