Replace Carpet with Vinyl Plank Flooring in Orlando, FL | GNX

Flooring

Replacing Carpet with LVP in Orlando: What the Job Actually Involves

Pulling up carpet and laying vinyl plank sounds like a weekend. The plank is the quick part. Here is what is under the carpet, what has to happen before the new floor goes down, and how long it really takes.

6 min readGNX Development
Bedroom with new luxury vinyl plank flooring installed by GNX Construction

Replacing bedroom or whole-house carpet with luxury vinyl plank is the most common flooring project we see in Central Florida. Carpet holds humidity, dust and pet odor, and vinyl plank is waterproof and easy to clean. The change is worth making. It helps to know what the job includes, because the difference between a floor that looks good for ten years and one that clicks underfoot in six months is decided before the first plank is laid.

What Is Under the Carpet

In most Orlando homes, lifting the carpet and pad reveals a bare concrete slab with tack strips nailed around the edge of every room. The strips come out, and the nail holes they leave are patched. It is also common to find old paint overspray, drywall mud, adhesive from a previous floor and the occasional hairline crack. None of that is alarming, but all of it has to be dealt with before a floating floor goes on top.

Slab Prep Is the Real Work

Carpet hides an uneven floor. Vinyl plank does not. Click-lock planks are joined at the edges, and if the slab under them dips or humps beyond the manufacturer's tolerance, the joints flex every time someone walks across. That is where clicking sounds and separated seams come from. Proper prep means scraping the slab clean, grinding high spots and filling low spots with a leveling compound, then letting it cure.

The Details People Forget to Budget For

  • Baseboards: carpet tucks under the baseboard, plank does not. You either add quarter round, or remove and reset the baseboards, or replace them for the cleanest look.
  • Doors: if the new floor is thicker or thinner than the carpet was, interior doors may need trimming and door casings are undercut so the plank slides beneath them.
  • Transitions: where plank meets tile in a bathroom or kitchen, a transition strip bridges the height difference.
  • Stairs: carpeted stairs need stair-nose pieces, treads and risers, cut and glued one step at a time. Stairs are slow and should be priced separately.
  • Closets: small, awkward and easy to leave out of a quote. Make sure they are counted.
  • Furniture: someone has to move it, twice.

Choosing the Plank

Two specifications matter most. The first is the core: rigid-core plank, often labeled SPC, is stiffer and handles temperature swings near sliding doors and sunny windows better than flexible vinyl. The second is the wear layer, the clear coating that takes the abuse. For a household with kids, pets or rolling chairs, a wear layer of 20 mil or more holds up noticeably better than the thinner layers found on entry-level products. An attached pad is convenient, and you should check whether your product allows or forbids additional underlayment.

Can the Plank Go Over Existing Tile?

Often it can, which saves demolition in kitchens and baths. The tile has to be solidly bonded and level, and deep grout lines need to be filled so they do not show through over time. The trade-off is floor height: the new surface ends up higher, which affects doors, appliances and transitions. We check this during the estimate instead of deciding on install day.

How Long It Takes

  1. Removal: carpet, pad and tack strips out and hauled away, usually the first morning.
  2. Prep: scraping, grinding, patching and leveling. A few hours for a good slab, a day or more for a rough one, plus cure time for leveling compound.
  3. Installation: planks laid with expansion space at the walls, cuts at doorways and closets.
  4. Trim: baseboards or quarter round, transitions, door adjustments.
  5. Walkthrough: you walk the floor with us before the job is closed.

A single bedroom is typically a one to two day job. A whole home usually takes a few days, depending on square footage, stairs and how much slab preparation is needed. You should have that schedule in writing before work starts.

What a Complete Quote Looks Like

Ask for material and labor to be listed separately, and for removal, disposal, slab prep, baseboards, transitions and stairs to appear as their own lines. If slab prep is quoted as an allowance, ask what happens if the floor needs more. A quote that covers all of this will look more expensive than one that says only "install LVP", and it is the only one of the two you can actually compare.

GNX Construction replaces carpet with luxury vinyl plank across Orlando and Central Florida: removal, slab prep, installation, baseboards and transitions as one job with one written price. Licensed Florida building contractor #CBC1269497. Request a free in-home estimate.
#replace carpet with vinyl plank#vinyl plank flooring Orlando#carpet to LVP#LVP installation Orlando#flooring companies Orlando
Back to all articles

Ask any question or start a free flooring estimate.

Free estimate

Tell us about your floors. We'll come measure for free.

Fill in the form and we'll call to schedule a no-obligation in-home visit anywhere in Florida or Georgia. You get a written, itemized estimate, no pressure.

Prefer to call? (863) 265-5239
Office601 N Magnolia Ave, Orlando, FL 32801
LicenseFlorida Certified Building Contractor #CBC1269497